Pool builder near you
A pool for next summer? Start with a quote.
A few lines about your garden and we call you back to visit it. Free, and with no obligation.

Your pool project
Rather talk about it? Call us:01 23 45 67 89
Build
Concrete or shell, the size of your garden.
Renovate
New liner, coping, filtration, lighting.
Maintain
Opening, weekly care, winterizing.
Prices to get an idea
Indicative prices including VAT. The price of a pool depends on the ground, the access and the options: it is written in the quote after a visit.

Concrete pool
A pool built on site in reinforced concrete, in the size, shape and depth you choose, finished with liner, membrane or tiles.
from €28,000 6 to 10 weeks

Shell pool
A one-piece polyester shell set in the ground: faster to install, in a range of sizes and shapes.
from €19,000 2 to 4 weeks

Pool renovation
A tired pool brought back: new liner or membrane, cracks treated, coping, filtration and lighting renewed.
from €6,500 1 to 3 weeks

Weekly maintenance
A visit every week in season: cleaning, water analysis, treatment adjusted, filter checked, so you only swim.
from €90 per month April to October

Spring opening
The pool restarted after winter: cover removed, filtration restarted, water balanced and clear for the first swim.
from €180 half a day

Filtration and equipment
Pump, filter, salt chlorinator, heat pump and lighting: repaired, replaced or installed.
from €120 call-out half a day to a day
Pools from the area

Family pool on the lawn
Toulon · Reinforced concrete, sand liner

Pool and pool house
La Garde · Concrete blocks, reinforced membrane

Lap pool along the terrace
Hyères · Reinforced concrete, dark membrane

Shell pool by the terrace
Six-Fours-les-Plages · Polyester shell

Renovation under the stone wall
Ollioules · Existing concrete, new membrane

Infinity edge in mosaic
Sanary-sur-Mer · Reinforced concrete, glass mosaic
A visit of the garden and a written quote
Ground, access for the machines, slope, sun: we look before drawing, and the quote details the structure, the equipment and the finishes.
Ten years on the structure
The pool shell is covered by our ten-year insurance, the equipment by a two-year guarantee, the whole job by the one-year completion guarantee.
The paperwork prepared with you
Plans for the prior declaration or the building permit, and a reminder of the tax declaration once the pool is finished.
One contact, before and after
The team that builds your pool is the one that opens it in spring, winterizes it in autumn and comes back when the pump stops.
Garden visit
Ground, access, sun and your wishes: size, shape, depth, budget.
Plans and quote
A plan, a written quote, and the file for the town hall.
Construction
Excavation, structure, plumbing and filtration, coping and finish.
Handover and first swim
Filling, water balance, safety device fitted, and a lesson on the equipment.
Good to know before you dig
Town hall: declaration or permit
An uncovered pool of 10 to 100 m² needs a prior declaration; above 100 m², or with an enclosure over 1.80 m high, a building permit.
A safety device is mandatory
Every private in-ground pool must have at least one standard device: barrier, alarm, safety cover or enclosure. We fit it before you swim.
Declare it to the tax office
An in-ground pool is declared to the tax office within 90 days of completion and counts for property tax and the development tax.
Filling and drought rules
In a drought, a prefectoral order can forbid filling pools. We plan the filling with you and check the restrictions in force.
"From the first visit to the first swim, the same person answered the phone. The town hall file was ready before we even asked."
"Our old liner pool looked like a pond. New liner, new pump, new coping: it looks brand new, and the water stays clear."
"They open it in April, winterize it in October and come by every week in summer. We just swim."
Swimming by next summer?
A pool project takes a few months: ask for your quote now.